| The scheme shall be depicted as far as
possible on mine plans and sections duly supplemented by
tabular statements / charts / diagrams or sketches in
support, keeping the descriptive matter to the minimum
essential. The plans and sections prescribed under
Mineral Conservation and Development Rules,1988 and the
relevant ones under Metalliferrous Mines Regulation 1961
shall be made full use of . In respct of any item(s)
where there is no change, reference to the approved
mining plan will be adequate. Brief description may be
added in respect of any other significant items where
there is change dealing with the folowing : |
PART-I |
| CHAPTER - 1 |
| 1.0 REVIEW OF MINING PLAN |
| 1.1 Name of the mine. |
| 1.2 Particulars of approval of mining
plan ( under MCR or MCDR, indicate approval letter no.
and date) |
| 1.3 Date of commencement of mining
operations. |
| 1.4 A review of compliance position of
salient features of the mining plan including conditions
and stipulations imposed, if any, on yearwise basis. This
may include exploration, mine development, exploitation,
waste management , afforestation, mine reclamation and
any other sigmnificant features. |
PART-II |
| PROPOSAL UNDER SCHEME OF
MINING FOR THE NEXT FIVE YEARS |
| CHAPTER - 2 |
| 2.0 EXPLORATION AND RESERVES |
| 2.1 Reserves estimated in the approved
mining plan with grades. |
| 2.2 Depletion of reserves during the
period of mining plan. |
| 2.3. Additional reserves establised (
with basis and parameters considered) during the period
of mining plan. |
| 2.4 Updated reserves with grade (
indicate end use grade with analysis). as well as
marginal grades, based on above. |
| 2.5 Yearwise exploration proposed to be carried out
during the ensuing 5 years period. Location of trial pits
and / or boreholes to be depicted on the geological plan. |
| CHAPTER - 3 |
| 3.0 MINING |
| 3.1 Yearwise development for the ensuing
5 years period. |
| 3.2 Yearwise production for ensuing 5
years period. |
| 3.3 Any change in proposed method of
mining , drilling and blasting and deployment of
machinery, if so give details. |
| 3.4 Precaution to be observed during drilling and
blasting. |
| CHAPTER - 4 |
| 4.0 DISPOSAL OF MINE WASTE
AND SEPERATE STACKING OF SUB-GRADE MINERAL(S). |
| 4.1 Nature of waste and its rate of
yearly generation. |
| 4.2 Selection of dumping site. |
| 4.3 Method of dumping and maximum height
and spread of dump(s) |
| 4.4 Precautions for confinement of dumps
to prevent pollution of surface water bodies / courses. |
| 4.5 Arrangement for seperate stacking of sub-grade
minerals. |
| CHAPTER - 5 |
| 5.0 USE OF MINERALS |
| 5.1 Changes proposed in specifications
of mineral being sold including anticipated changes and
new industries using the minerals. |
| 5.2 Efforts made for utilisation of the
sub-grade minerals including fines. |
| CHAPTER - 6 |
| 6.0 EMPLOYMENT POTENTIAL |
| 6.1 Management and supervisory
personnel. |
| 6.2 Labour - skilled, semi-skilled,
unskilled. |
| ( Proposals for rectification of deficiencies noted,
if any, in the approved mining plan may please be
incorporated in each chapter) |
| 7.0 ENVIRONMENTAL MANAGEMENT
PLAN |
| |
| 1 |
2 |
3 |
4 |
| Salient items to be
covered under column nos. 2, 3 & 4 are as
under |
Proposals as per
approved mining plan |
Position at the end of
5 years of mining plan perid ( justification to
be given for any marked deviation) |
Proposals for the next
5 year plan period. |
| - Top soil storage,
preservation and utilisation |
| - Land reclamation
and rehabilitation |
| - Waste dump
management |
| - Afforestation
programme with precautions for survival &
protection of plantation |
| - Quality of mine and
any interference with surface water sources |
| - Fly rock problems
and precautions |
|
| CHAPTER- 8 |
| 8.0 CONCEPTUAL MINING PLAN |
| 8.1 Time frame of completion of mineral exploration
programme in leasehold areas. Give broad description
identifying potential area to be covered in the given
time frame. |
| 8.2 Whether ultimate pit limit has been determined
and demarcated on surface and geological plans. |
| 8.3 Whether the site(s) for disposal of waste rock
and unsaleable ores has / have been examined for adequacy
of land and suitability of long term use in the event of
continuation of mining activity. |
| 8.4 Whether back filling of pit(s) after recovery of
ore / mineral upto techno-economically feasible depth
envisaged. If so, describe the broad features of the
proposal. |
| 8.5 Post mining land use envisaged. |
| The five yearly succesive mining scheme should fit
into the above overall conceptual mining plan.
Improvements and changes if any, in the concpetual mining
plan may be incorporated in the succesive mining scheme
stages based on improved level of mechanisation, improved
knowledge of the deposit as a result of exploration,
changes in the use of mineral etc. |
| |
Prepared by
Recognised Qualified Person or a
person emoployed under clause (b) of
sub-rule (1) of rule 42 of MCDR,1988
( RQP No. or Ref. of permission under rule 42
of MCDR should be indicated)
|